Daikin BRC1E51A7 Instrukcja Użytkownika Strona 20

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 58
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 19
18 English
2
Press On/Off button.
The Operation lamp (green) will be lit
and the system will start operating.
The microcomputer is in automatic temperature and fan speed *
control. Therefore, temperature or fan speed settings cannot be
made or changed while the air conditioner is in operation.
3
Make air ow direction settings from the main menu
(see page 28).
The air ow direction of the system cannot be changed unless the *
system is provided with a function to allow air ow direction
changes.
4
The Operation lamp will be turned OFF
and the system will stop operating when
On/Off button is pressed again.
Note
Do not turn power OFF soon after the system stops operating.
Be sure to wait for at least ve minutes so that the drain
discharging device will nish discharging the residual drain.
Otherwise, water leakage or failures may result.
Basic Operation Method (Use of Direct Buttons)
01_EN_EM08A085.indd 1801_EN_EM08A085.indd 18 4/7/2009 4:39:11 PM4/7/2009 4:39:11 PM
Przeglądanie stron 19
1 2 ... 15 16 17 18 19 20 21 22 23 24 25 ... 57 58

Komentarze do niniejszej Instrukcji

Brak uwag