Daikin BRC1C71 Instrukcja Instalacji

Przeglądaj online lub pobierz Instrukcja Instalacji dla Klimatyzatory typu split Daikin BRC1C71. Daikin BRC1C71 Installation manual Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 13
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 0
Read these instructions carefully before installation.
Keep this manual in a handy place for future reference.
This manual should be left with the equipment owner.
MODELS
Floor standing type and Concealed floor standing type
FXLQ12MVJU FXNQ12MVJU
FXLQ18MVJU FXNQ18MVJU
FXLQ24MVJU FXNQ24MVJU
SYSTEM Inverter Air Conditioners
INSTALLATION MANUAL
Przeglądanie stron 0
1 2 3 4 5 6 ... 12 13

Podsumowanie treści

Strona 1 - INSTALLATION MANUAL

Read these instructions carefully before installation.Keep this manual in a handy place for future reference.This manual should be left with the equip

Strona 2 - 1 English

8CAUTION• Be sure to attach the sealing material or putty (field supplied) to the hole for wiring to prevent the infiltration of water as well as any

Strona 3 - 1. SAFETY CONSIDERATIONS

93. When including BS unitNOTE1. A single switch can be used to supply power to units on the same system. However, branch switches and branch circuit

Strona 4 - 2. BEFORE INSTALLATION

10• Set the remote controller to the field set mode. For details, refer to the “HOW TO SET IN THE FIELD”, in the remote controller manual. • When in t

Strona 5 - 2-3 NOTE TO THE INSTALLER

(0407) HT3P086154-3E EM04A011Daikin US Corporation375 Park Avenue, Suite 3308New York, NY 10152��[email protected] ��

Strona 6 - 5. INDOOR UNIT INSTALLATION

1 English1. SAFETY CONSIDERATIONS...12. BEFORE INSTALLATION...23.

Strona 7 - 6. REFRIGERANT PIPING WORK

1VRV SYSTEM Inverter Air Conditioners Installation manualCONTENTS1. SAFETY CONSIDERATIONS...12. BEFORE INSTALLA

Strona 8 - 7. DRAIN PIPING WORK

2CAUTION• While following the instructions in this installation man-ual, insulate piping in order to prevent condensation.Improper piping insulation m

Strona 9 - THE REMOTE CONTROLLER

3FOR THE FOLLOWING ITEMS, TAKE SPECIAL CARE DURING CONSTRUCTION AND CHECK AFTER INSTALLATION IS FINISHED.a. Items to be checked after completion of wo

Strona 10 - 9-2 WIRING EXAMPLE

44. PREPARATIONS BEFORE INSTALLA-TION(1) Positioning of holes for fastening to the wall(2) How to open / close the front panel (FXLQ)1. Open the lid o

Strona 11 - 10. FIELD SETTING

5(4) Perform the following procedure to mount the remote controller (optional accessory) on the unit if desired. (FXLQ type only)• Open the left side

Strona 12 - 11. TEST OPERATION

6CAUTIONCAUTION TO BE TAKEN WHEN BRAZING REFRIGER-ANT PIPINGDo not use flux when brazing refrigerant piping. Therefore, use the phosphor copper brazin

Strona 13 - Daikin US Corporation

7CAUTION• Drain piping connectionsDo not connect the drain piping directly to sewage pipes that smell of ammonia. The ammonia in the sewage might ente

Komentarze do niniejszej Instrukcji

Brak uwag