Daikin BSVQ-P Instrukcja Użytkownika Strona 2

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 8
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 1
2
Replacement VRV
The Daikin Solution to R-22 Phase Out
Due to significant developments in heat pump technology, todays air conditioning systems, running on
R-410A refrigerant, offer better performances than R-22 and R-407C systems did in the past. Furthermore,
R-22 will be soon unavailable in Europe. Already today, only reclaimed or recycled R-22 can be used for
servicing. To upgrade R-22 and R-407C systems as cost effectively as possible, Daikin units can be installed
using existing pipe work. Replacement technology is available for residential and commercial applications
in the following ranges:
› Split
Sky Air
› VRV
Plan your system replacement now!
Low cost refurbishment
Replace your R-22 / R-407C outdoor unit with R-410A technology, but keep your refrigerant piping and in some cases your indoor units
1
.
In case your indoor units can remain, works only need to be carried out at the outdoor unit and not inside your building (in case of a heat
pump installation).
replace
replace
replace
1
1
Indoor units from VRV K series or later can remain.
Mix or old R-22 and new R-410A indoor units is not possible.
replace
1
replace
1
1. Replace outdoor unit
2. Replace BS-boxes (in case of H/R)
3. Replace indoor units (check with your local dealer if needed)
4. The system will automatically clean the piping & charge the correct amount of R-410A refrigerant
The R-22 phase-out regulation will impact on all currently operating
R-22 systems, although reliable R-22 equipment does not need to
be replaced immediately because maintenance can be carried out
with recycled or reclaimed R-22 until January 1st, 2015. However,
currently not enough R-22 is reclaimed or recycled to cover the
demand, supply shortages and price increases are expected.
If there is no reclaimed or recycled R-22 available, certain repairs
(for example: compressor change) are no longer possible and
considerable air conditioning system downtime can occur.
KEEP REFRIGERANT PIPING
It is therefore worthwhile to consider a replacement system before 2015, especially for air conditioning systems
with a large impact on the daily running of the business.
Przeglądanie stron 1
1 2 3 4 5 6 7 8

Komentarze do niniejszej Instrukcji

Brak uwag